INFRASTRUCTURE

 

DATE OF ESTABLISHMENT = 24th FEBRUARY 1961
TOTAL AREA OF THE PLOT = 3353 SQ.MTRS.
BUILT- UP AREA = 2,673.55 SQ.MTRS.
LICENCED / INSTALLED CAPACITY = 10,000 M.T. PER ANNUM.

 

PLANT & MACHINERY

 

Description

Capacity

Qty

Oil Fired Tilting Furnaces

2 Tons / 3 Tons

4 Nos.

Pit Furnaces

10 – 500 kgs.

2 Nos.

Die-casting Machines

600 T / 400 T / 60 T

3 Nos.

Hot Chamber Machine

ZN 200 / A – 5 Buhler

2 No.

Radial Drilling Machine

1½”

1 No.

Pillar Drilling Machine

½” & ¾”

2 Nos.

Lathe Machines

4’ , 6’ & 20

4 Nos.

E. O. T. Cranes

3 Tons & 5 Tons

4 Nos.

Plate Bending Machine

12 mm Thick

1 No.

Band Saw Cutting Machine

-

1 No.

Wire Drawing Machine

-

2 Nos.

Stick Rolling Machine

-

2 Nos.

Strip Rolling Machine

-

2 Nos.

Lead Wool Machine

-

1 No.

Shaping Machine

24 Stroke

1 No.

Planner Machine

-

1 No.

 

  LAB & TESTING EQUIPMENT

 

Description

Qty

Spectrometer - 8450

1 No.

Oven - Square

1 No.

Wet Analysis Equipments for Non – Ferrous metals

---

Hot Plate  60 x 45 cms.

1 No.

Damping Balance – 200 gms.

2 Nos.

Electrolizer / Platinum Electrodes

1 No.

Digital Thermometer (Range : 0 to 1200°C)

1 No.